Description
What’s included:
- Most frequently used parts to build the structures, in sufficient quantity and ratio count
- Structure-specific components (e.g. conveyors for flow racks)
Options:
- Tube color
- Customized changes to part list
Benefits
- Best way to ease your team into using this equipment
- No more headaches of making sure that you have all the necessary parts
- Can build 3 or 4 sizeable structures with the parts included
- No unnecessary leftover units
You will need
- Tool to cut your pipe to the desired length. If you don’t have any saw at your facility, we recommend the following cheap tool to start: T-CUTTER